Plumbing
The plumbing has been roughed-in and passed inspection. If weather permits, we hope to pour the concrete slabs early next week.
-
2010 B*U*I*L*D Retreat Full
The 2010 Father/Son B*U*I*L*D retreat is full. Contact our office today if you would like to be added to the waiting list.
-
Spaces Available
There are still spaces available in the following camp weeks: June 6-12 — Grades 3-5 (girl and boy spaces) June 6-12 — Grades 6-8 (girl and boy spaces) June 13-19 — Grades 6-8 (girl and boy spaces) July 4-10 — Grades 7-9 (boy spaces) Visit the CWR registration page to download a form.
-
Gravel Backfill
-
Foundation Blocks
The foundation blocks have been completed and are ready for the gravel backfill.
-
Footings Poured
The footings have been poured and the foundation blocks will soon be laid.
-
Dormitory Footers & Access Road
E. Carroll Mann Contractors is digging the footings of the two dormitories and Glover Construction is on site to complete the graveling of the entry road and parking lot. Also, they installed and graveled the access road to the dorm construction site. We praise the Lord for those who are partnering with us to see CWS become a reality. This is a great day!
-
Surveying the access road
Chandler Land Surveying is on site to stake the access road to the two dormitories under construction as well as staking the location of utility transformers.