Construction Update – 11/13
The temperatures may be dropping but construction at Camp Willow Springs is heating up! There is drywall being installed in the Meeting Room and siding is being put on the Pool House. The progress in construction along with the 2014 Summer Camp Dates being announced gives us much to be thankful for!